Hero image for The Protocol War: IEC 61850 vs. IEC 60870-5-104
GridHacker Team

The Protocol War: IEC 61850 vs. IEC 60870-5-104

In fact, if you approach IEC 61850 with the mindset of a legacy serial-to-IP migration, you are essentially building a high-speed, high-complexity failure po...

iec 61850 60870
Hero image for Protocol Wars: Why Your SCADA Architecture is Likely Over-Engineered or Under-Protected
GridHacker Team

Protocol Wars: Why Your SCADA Architecture is Likely Over-Engineered or Under-Protected

Conversely, we see critical infrastructure relying on Modbus polling loops that choke the moment a network broadcast storm hits, leading to stale data that o...

iec 61850 modbus
Hero image for The IEC 61850 Fallacy: Why GOOSE isn't a Magic Bullet
GridHacker Team

The IEC 61850 Fallacy: Why GOOSE isn't a Magic Bullet

If you’ve spent any time actually commissioning these systems, you know the truth: it’s a high-stakes exercise in network configuration, VLAN management, and...

iec 61850 goose
Hero image for IEC 61850 vs. DNP3: Stop Pretending They Are Interchangeable
GridHacker Team

IEC 61850 vs. DNP3: Stop Pretending They Are Interchangeable

I have watched senior engineers spend weeks trying to map legacy RTU points into an SCL (Substation Configuration Language) file, only to realize that their ...

iec 61850 dnp3
Hero image for Why Your IEC 61850 Implementation is Likely Lying to You
GridHacker Team

Why Your IEC 61850 Implementation is Likely Lying to You

Welcome to the reality of **IEC 61850** error handling—or rather, the lack thereof.

iec 61850 error
Hero image for IEC 61850 vs. IEC 60870-5-104: Choosing the Right Protocol for Substation Automation
GridHacker Team

IEC 61850 vs. IEC 60870-5-104: Choosing the Right Protocol for Substation Automation

If you are still trying to force a legacy SCADA mindset onto a modern digital substation, you are setting yourself up for a world of pain.

iec 61850 104